Aero Solutions | PoleMax MP3 Channel Reinforcement
Aero Solutions enables our clients to expedite their deployments of macrocell and small cell wireless networks. With over 15 years of continual innovation, performing over 4,000 design/build tower collocations, and extensive small cell engineering and project management experience, we have established ourselves as a national leader in the wireless infrastructure market.At the heart of our company, we are innovators, led by technical excellence and a clear understanding of what happens in the field. Our delivery team works tirelessly, year after year, to keep us ahead of the curve by providing forward thinking solutions and outstanding customer service.
telecomm, telecommunications engineering, tower reinforcement, macro cell, small cell, wireless, wireless infrastructure market, wireless optimization, tower collocations, telecomm innovation, wireless networks, small cell engineering, macro cell engineering, expedite deployments, municipal consulting, telecomm consulting, telecomm experts, telecomm project management, wireless industry leader, wireless industry experts, turnkey collocations, technical field service, telecomm field service, smart poles, rooftop deployment, telecomm innovators,
673
post-template-default,single,single-post,postid-673,single-format-standard,ajax_fade,page_not_loaded,,select-child-theme-ver-1.0.0,select-theme-ver-3.7,side_area_uncovered,wpb-js-composer js-comp-ver-5.0.1,vc_responsive
 

PoleMax MP3 Channel Reinforcement

PoleMax MP3 Channel Reinforcement

portfolio MP4PoleMax MP3 Channel Reinforcement  |  Morgantown, West Virginia

Project Description:

This monopole is located in Morgantown, WV and provides cell coverage for the greater Philadelphia area. This project focused on providing a non-welded shaft solution as well as a base plate upgrade for the modification and placement of new antennas.


Aero Solutions Role:

Aero Solutions provided a design/build solution to bring the tower into TIA compliance with the new antenna loading using non-welded reinforcing elements. Due to the new wind area of the antennas, sections of the monopole were overstressed and required reinforcement using the PoleMax® MP3 channels. Bolted channels were installed symmetrically around the pole from 0 – 109 feet. The base plate upgrade consisted of the installation of 3 new anchor rods with brackets, gussets, foot pads as well as transition stiffeners with bearing plates. Aero Solutions managed the engineering, drawings, material fabrication, installation and closeout of the project.

Technical Description:

Tower Type: Monopole
Tower Height: 150 feet
Client: Crown Castle International

MP4 Port Trio

No Comments

Sorry, the comment form is closed at this time.